Project: Sportsman   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Kyle Stone   -  
Project:   Glasair - Sportsman 2+2   -   VIEW REPORTS
Total Hours:1859.9
Start/Last Date:Jul 03, 2019 - Jun 30, 2022
Engine:Lycoming IO-390-EXP
Panel:Garmin G3X w/ GNX375 IFR nav, GNC 255 NAV/COM
 
Friendly URL: https://eaabuilderslog.org?s=Sportsman

Home or Last Project Picture

Jul 30, 2021     Install engine control cables - (6 hours)       Category: Fuselage (VIII)
Fabricated insert and installed Throttle, Mixture, and Prop engine control cables. Used the nut tool from GAOA and it worked great! Had some minor issues with the fit but with the help of Coby and members of the GAOA the problem was quickly solved.

Had to reposition all of the control arms (Throttle, Mixture, and Governor). Not a huge deal but I did not realize this on the Prop Governor until AFTER I had safety wired all the screws from mounting the bracket.....good practice for safety wire tying.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.